Projects

Small hydro power plants

Vjetroelektrane Solarne elektrane Hibridni sistemi

Main and preliminary design

SHPP < 1MW

Main and preliminary design  |  Location: Rijeka Slatina – Municipality Kolasin, Montenegro   |   Investor: BB HIDRO Ltd. – Podgorica

449 kW (510 kVA)   |  Tyrolean water intake with Coanda screen  |  Penstock 1531 m   |  Transmission line 10 kV, 18 m

Turbine:  2 x horizontal Pelton   |   Pt = 483 kW   |   Qi = 0,260 m3/s   |   Hn = 206,09 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design  |   Location: Rijeka Bjelojevicka – Municipality Mojkovac, Montenegro   |   Investor: C&S ENERGY Ltd. – Podgorica

740 kW (920 kVA)   |   Tyrolean water intake with Coanda screen   |   Penstock 1216 m    |   Transmission line  35 kV, 4330 m

Turbine:  vertical Pelton   |   Pt = 783 kW  l      Qi = 0,80 m3/s   |   Hn=110,32 m

Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Lokacija: Rijeka Bistrica – Municipality Kolasin, Montenegro   |   Investitor: BB HIDRO Ltd. – Podgorica

928 kW (1200 kVA)   |    Tyrolean water intake with Coanda screen   |   Penstock 1438 m   |   Transmission line 10 kV, 30 m

Turbine:  Cross-flow (two-chamber Banki)   |   Pt = 986 kW   |   Qi = 1,90 m3/s   |   Hn = 62,20 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Rijeka Ljevak – Municipality Mojkovac, Montenegro   |   Investor: Simes inzenjering Ltd. Podgorica

560 kW (621 kVA)   |    Tyrolean water intake with Coanda screen    |   Penstock 1329 m   |   Transmission line 10 kV, 4330 m

Turbine:  vertical Pelton   |   Pt = 592 kW   |   Qi = 0,74 m3/s   |   Hn = 91,04 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Rijeka Rastak – Municipality Kolasin, Montenegro   |   Investor: Kol Energy Ltd. – Kolasin

743 kW (800 kVA)   |   Tyrolean water intake with Coanda screen   |   Penstock 770 m

Turbine:  vertical Pelton   |   Pt = 790 kW   |   Qi = 0,40 m3/s   |   Hn = 223,24 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Rijeka Vrelo – Municipality Bijelo Polje, Montenegro   |   Investor: Synergy Ltd. – Podgorica

Installed power plant 608 kW  (720 kVA)   |   Tyrolean water intake with Coanda screen   |   Penstock 726 m   |   Transmission line  35 kV, 4330 m

Turbine:  vertical Pelton   |   Pt = 646 kW   |   Qi = 0,80 m3/s   |   Hn = 93,70 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

SHPP > 1MW

Main and preliminary design    |   Location: Rijeka Bjelojevicka – Municipality Mojkovac, Montenegro   |   Investor: C&S ENERGY Ltd. – Podgorica

1968 kW (2250 kVA)   |    Tyrolean water intake with Coanda screen    |   Penstock 4207 m   |   Transmission line 35 kV, 2745 m

Turbine:  vertical Pelton   |   Pt = 2079 kW   |   Qi = 1,00 m3/s   |   Hn = 236,23 m

Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Djuricka Rijeka – Municipality Plav, Montenegro   |   Investor: Plava Hydro Power Ltd. – Ulcinj

2778 kW (3310 kVA)   |   Tyrolean water intake with Coanda screen   |   Penstock: Jasenički 2677 m, Trokutski 3086 m, Hotski 6969 m   |   Transmission line 10 kV, 4350 m

Turbine: 3 x horizontal Pelton & Francis   |   Pt = 2778,16 kW    

Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Djuricka Rijeka – Municipality Plav, Montenegro   |   Investor: Plava Hydro Power Ltd. – Ulcinj

1739 kW (2100 kVA)   |   Lateral water intake   |   Penstock 3945 m   |   Transmission line 10 kV, 3300 m

Turbine:  2 x Francis   |   Pt = 1077+806 = 1883 kW   |   Qi = 2,00+1,50 = 3,5 m3 /s   |   Hn = 59,01 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Rijeka Komaraca – Municipality Plav, Montenegro   |   Investor: Normal Company Ltd. Podgorica

3722 kW (4400 kVA)   |    Tyrolean water intake   |   Penstock 3492 m   |   Transmission line 35 kV, 85 m

Turbine:  2 x vertical Pelton   |   Pt = 2 x 1979 kW   |   Qi = 2 x 1,90 = 3,80 m3/s   |   Hn = 116,8 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Ravna Rijeka – Municipality Bijelo Polje, Montenegro   |   Investor: Hydro Bistrica Ltd. – Podgorica

3456 kW (4000 kVA)   |   Lateral water intake   |   Penstock 3733 m   |  Transmission line 10 kV, 2420 m

Turbine:  2 x hortizontal Francis   |   Pt = 2 x 1846 kW   |   Qi = 2 x 2,10 = 4,20 m3/s   |   Hn = 95,5 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Rijeke Babinopoljska i Hridska – Municipality Plav, Montenegro   |   Investor: Kronor Ltd. Podgorica

2123 kW (2460 kVA)   |    Tyrolean water intake with Coanda screen    |   Penstock 1160 m

Turbine: 2 x vertical Pelton   |   Pt = 1640+618 = 2258 kW   |   Qi = 1+0,40 = 1,40 m3/s   |   Hn= 185,35 m i Hn= 173,2 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Main and preliminary design    |   Location: Temnjacka & Treskavicka rijeka – Municipality Plav, Montenegro   |   Investor: Kronor Ltd. Podgorica

4567 kW (5400 kVA)   |   Tyrolean water intake with Coanda screen   |   Penstock: 2527 m & 2828 m

Turbine:  3 x vertical Pelton   |   Pt = 2 x 1617,5+1620 kW   |   Qi = 2 x 0,825+0,750 m3/s   |   Hn= 222,77 m i Hn= 245,23 m

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Conceptual designs

SHPP < 1MW

Conceptual design    |   Location: Lazanjska rijeka – Plav, Montenegro   |   Investor: KRONOR Ltd.

683 kW (800 kVA)   |   Tyrolean water intake   |   Penstock 4284 m

Conceptual design    |    Location: Misnjicev potok – Mojkovac, Montenegro   |   Investor: Rade Misnjic

222 kW (270 kVA)   |    Tyrolean water intake    |   Penstock 1315 m

Conceptual design    |    Location: Rijeka Bukovicka vrela – Municipality Kolasin, Montenegro   |   Investor: WATER GROUP Ltd.

322 kW (380 kVA)   |    Tyrolean water intake   |   Penstock 400 m

Conceptual design    |   Location: Lazanjska rijeka – Andrijevica, Montenegro   |   Investor: ERLANG Ltd.

549 kW (680 kVA)   |   Tyrolean water intake    |   Penstock 3268 m

Conceptual design    |   Location: Rijeka Bukeljka – Minicipality Rozaje, Montenegro   |   Investor: ARTEK Ltd.

496 kW (560 kVA)   |    Tyrolean water intake    |   Penstock 2914 m

Conceptual design    |    Location: Radmanska rijeka – Petnjica, Montenegro   |   Investor: SHPP MONTENEGRO 2 Ltd.

931 kW (1250 kVA)   |    Tyrolean water intake    |   Penstock 1900 m

Conceptual design    |   Location: Rijeka Seremet – Andrijevica, Montenegro   |   Investor: Nord Elektro Ltd.

571 kW (650 kVA)   |   Tyrolean water intake   |   Penstock 1161 m

Conceptual design    |   Location: Leverska rijeka – Pljevlja, Monetenegro   |   Investor: BB HYDRO d.o.o.

620 kW (700 kVA)   |   Tyrolean water intake   |   Penstock 956 m

Conceptual design    |   Location: Rijeka Skrbusa – Kolasin, Montenegro   |   Investor: SOHO GROUP Ltd.

949 kW (1150 kVA)   |   Tyrolean water intake    |   Penstock 200 m

Conceptual design    |   Location: Rijeka Vodjenicki potok – Andrijevica, Montenegro   |   Investor: Nord Elektro Ltd.

251 kW (310 kVA)   |   Tyrolean water intake  |   Penstock 1565 m

Conceptual design    |   Location: Kaludarska rijeka – Berane, Montenegro   |   Investor: HYDRO KALUDARSKA Ltd.

939 kW (1250 kVA)   |   Tyrolean water intake   |   Penstock 4683 m

SHPP > 1MW

Conceptual design    |   Location: Lazanjska rijeka – Bijelo Polje, Montenegro   |   Investor: Consortium HYDRO LJESTANICA

2331 kW (2800 kVA)   |    Tyrolean water intake   |    Penstock 4000 m

Conceptual design    |   Location: Rijeka Ratnja – Kolasin, Montenegro   |   Investor: LJETOPIS AUTOMOTIVE Ltd.

1382 kW (1600 kVA)   |    Tyrolean water intake   |    Penstock 2105 m

Conceptual design    |   Location: Rijeka Vrbnica – Pluzine, Montenegro   |   Investor: MHE VRBNICA Ltd.

4902 kW (5700 kVA)   |   Tyrolean water intake   |   Penstock 2950 m

Conceptual design    |   Location: Trnovacka rijeka – Kolasin, Montenegro   |   Investor: LJETOPIS AUTOMOTIVE Ltd.

2067 kW (2500 kVA)   |   Tyrolean water intake   |   Penstock 1545 m

Conceptual design    |   Location: Rijeka Bijela – Municipality Savnik, Montenegro   |   Investor: DP INGENERIA Ltd.

3439 kW (3930 kVA)   |   Lateral water intake   |    Penstock 3679 m

Conceptual design    |   Location: Kaludarska rijeka – Berane, Montenegro   |   Investor: Consortium HYDRO KALUDARSKA

1980 kW (2500 kVA)   |   Tyrolean water intake    |   Penstock 4683 m

Revisions

Main and preliminary design revision    |   Location: Rijeka Zeta – Municipality Danilovgrad, Montenegro   |   Investor: Zeta Energy Ltd.

Main and preliminary design revision    |   Location: Rijeka Zeta – Municipality Danilovgrad, Montenegro   |   Investor: Zeta Energy Ltd.

Supervisions

Site supervision    |   Location: Rijeka Bistrica – Municipality Kolasin, Montenegro

Site supervision    |   Location: Rijeka Ljevak – Municipality Mojkovac, Montenegro

Site supervision    |   Location: Rijeka Zeta – Municipality Danilovgrad, Montenegro

Site supervision    |   Location: Rijeka Zeta – Municipality Danilovgrad, Montenegro

Wind power plants

Wind power plants > 1MW

Main and preliminary design   |   Location: Brdo Mozura – Bar/Ulcinj, Montenegro   |   Investor: MOZURA WIND PARK Ltd.

(46 MW)   |   23 wind power generators x 2 MW   |   transformer station 30/110 kV,  50 MW   |   transmission line 110 kV,  0,5 km

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Solar power plants

ON GRID

Engineering and installing

Engineering and installing    |   Location: Bar, Montenegro

5,50 kW   |  Photovoltaic panels 22 kom x 250 W   |   Inverter 10 kVA

Full screenExit full screen
ArrowArrow
Slider

Engineering and installing    |   Location: Gusinje, Montenegro

8,97 kW   |    Photovoltaic panels 39 kom x 230 W   |   Inverter 12 kVA

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Engineering and installing    |   Location: Herceg Novi, Montenegro

8,75 kW   |   Photovoltaic panels 35 kom x 250 W   |   Inverter 10 kVA

Full screenExit full screen
ArrowArrow
Slider

Supervision and revision

Supervision and revision  |   Location: Danilovgrad, Montenegro

996,5 kW   |   Photovoltaic panels 3986 kom x 250 W   |   Inverter 1020 kVA

previous arrow
next arrow
Full screenExit full screen
ArrowArrow
Slider

Assessment

Assessment of green investments at Voli trade Ltd. (2018)